Well-designed water distributor for water treatments FD5675 to Madras Factories

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Our concentrate on is always to consolidate and improve the high-quality and repair of existing items, meanwhile continuously produce new products to meet distinctive customers' requires for Air Pressure Gauge , Distribution Tubes , 1 inch fleck Water Distributor , Remember to come to feel absolutely free to speak to us for organization. nd we believe we are going to share the most beneficial trading practical experience with all our merchants.
Well-designed water distributor for water treatments FD5675 to Madras Factories Detail:

Feilite brine valve for water softener

Fob price :us1.5-4/piece

Min.order quantity:10 piece/pieces

Supply Ability: 20000 pieces per month

Port: Ningbo/Shanghai

Payment Terms: L/C,T/T

Place of Origin: Zhejiang, China (Mainland)

Brand Name: yujing

Model Number: FU6260

material:: PP and ABS

Supply type:: Make-to-Order

Certification:: ISO:9001

OEM:: Yes

Manufacturer:: Yes

Specification:

 

Packaging & Delivery

 

Packaging Details: Carton or as per your request
Delivery Detail: 7 to 15Days

 

6 laterals Water Distributor for water filter or strainer

 

Item no.

Dimensions(mm)

Diameter of tank (inches/mm)

Top opening

Gap

Rate of flow

A       B        C

FU6260

255  99  50/48.5

12″~16″ (Ø300~Ø400mm)

4”THREAD

0.25mm

10T/H-15T/H
FU6370

365  155  50/48.5

18″~21″ (Ø450~Ø550mm)

4”THREAD

0.25mm

FU6450

450  200  50/48.5

24″ (Ø600mm)

4”THREAD

0.25mm

FU6600

610  280  50/48.5

30″ (Ø750mm)

4”THREAD

0.25mm

FU6700

700  325  50/48.5

36″ (Ø900mm)

4”THREAD

0.25mm

FU6800

850  400  50/48.5

40″ (Ø1000mm)

4”THREAD

0.25mm

FU6900

940  445  50/48.5

48″ (Ø1200mm)

4”THREAD

0.25mm

 

High flow series:

Item no.

Dimensions(mm)

Diameter of tank (inches/mm)

Top opening

Gap

Rate of flow

A       B        C

FU6260B

310  132  50/48.5/63

16″~18″ (Ø400~Ø450mm)

4”THREAD

0.2mm/0.25mm/0.5mm

10T/H-20T/H
FU6370B

430 197  50/48.5/63

21″ (Ø550mm)

4”THREAD

0.2mm/0.25mm/0.5mm

FU6450B

500  227  50/48.5/63

24″ (Ø600mm)

4”THREAD

0.2mm/0.25mm/0.5mm

FU6600B

620  290  50/48.5/63

30″ (Ø750mm)

4”THREAD

0.2mm/0.25mm/0.5mm

FU6700B

750  353 50/48.5/63

36″ (Ø900mm)

4”THREAD

0.2mm/0.25mm/0.5mm

FU6800B

870  416  50/48.5/63

40″ (Ø1000mm)

4”THREAD

0.2mm/0.25mm/0.5mm

FU6900B

90  479  50/48.5/63

48″ (Ø1200mm)

4”THREAD

0.2mm/0.25mm/0.5mm

 


Product detail pictures:

Well-designed water distributor for water treatments FD5675 to Madras Factories detail pictures


Which has a positive and progressive attitude to customer's fascination, our enterprise consistently improves our item excellent to satisfy the desires of customers and further focuses on safety, reliability, environmental demands, and innovation of Well-designed water distributor for water treatments FD5675 to Madras Factories, The product will supply to all over the world, such as: Brazil, Sydney, Germany, We are going to not only continuously introduce technical guidance of experts from both home and abroad, but also develop the new and advanced products constantly to satisfactorily meet the needs of our clients all over the world.


  • The Suns of Power design team from California Polytechnic State University, Mechanical Engineering Department, senior project: design, analyze, build, test and operate a solar thermal electric generator that is capable of producing at least 200 W of usable electricity over the course of 1 hour.

    As of April 19th, 2009, the system is almost completed. In this video we are hooking up the final components. We are testing the flowmeter, pressure gauges, thermocouples, pump, steam separator and various other components.

    Here’s how the cycle works:
    Water is pumped through the collection pipe (11′ painted stainless steel, enclosed by a 10′ shot glass tube) located at the focal point of the mirror. When the mirror is focused at the sun, the water is boiled into steam. The steam leaves the collection pipe and flows into a steam separator. The steam flows through the top line of the separator, while any condensate drains through the bottom of the separator. In the steam line (on the top side of the cart), the steam travels through a needle valve that is used for throttling the steam engine. Also on this line is a pressure gauge and a displacement lubricator. Steam enters the lubricator and condensates. The condensate falls to the bottom and displaces the steam engine piston oil into the steam line. The steam then reaches that steam engine. The flywheel will soon be connected to a DC motor used as a generator. The steam then exits the steam engine through a check valve and meets up with the condensate that flowed down through the separator. This condensate/steam mixture is pumped up to a fin-fan heat exchanger that acts as the condenser. The condensed steam line connects to an expansion tank.. The expansion tank acts as a fill point for the system, allows thermal expansion of the water, sets the condenser pressure to atmospheric and provides the pump’s required Net Positive Suction Head to eliminate cavitation in the pump. The water then flows down through a 5-micron, high temperature water filter and then to the micro magnetic driven gear pump. There is a thermocouple on the suction side, as well as pressure gauges at the suction and discharge. The flow rate of the water can be read off of the rotameter style flowmeter located directly after the pump. The water is then pumped underneath the mirror and then back through the collection pipe where the cycle begins again.

    If you have any questions about our project, please email us or leave comments. We will respond as quickly as our busy schedules allow us. Thanks for watching!

    (Music by The Learn-by-doings)



    How To: Bend copper tubing into coils. Easy way of shaping copper tubing. The shaped copper tubing can be used in solar heating, heat and cooling exchangers and induction coils. I have used this method for making curved copper for my gaming liquid cooling system. I know my work area is a mess, and my video making quality is not the greatest. I am a project in progress. Thanks for watching! Please contact me for any additional information you require.
    .

    Staff is skilled, well-equipped, process is specification, products meet the requirements and delivery is guaranteed, a best partner!








    5 Stars By Michelle 2015-11-15 17:27
    Adhering to the business principle of mutual benefits, we have a happy and successful transaction, we think we will be the best business partner.






















    5 Stars By Edward 2016-2-27 17:52

    Send your message to us:

    INQUIRY NOW
    • * CAPTCHA: Please select the Truck

    Related Products

    INQUIRY NOW
    • * CAPTCHA: Please select the Key

    WhatsApp Online Chat !