Renewable Design for water distributor for water treatments FD5673 for Slovenia Factories

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

The very abundant projects administration experiences and 1 to just one provider model make the higher importance of company communication and our easy understanding of your expectations for Shock-Proof Pressure Gauge , pilot operated solenoid valve , Pressure Gauge , Welcomes all overseas friends and retailers to establish collaboration with us. We're going to give you with straightforward, top quality and effective services to fulfill your demands.
Renewable Design for water distributor for water treatments FD5673 for Slovenia Factories Detail:

Feilite brine valve for water softener

Fob price :us1.5-4/piece

Min.order quantity:10 piece/pieces

Supply Ability: 20000 pieces per month

Port: Ningbo/Shanghai

Payment Terms: L/C,T/T

Place of Origin: Zhejiang, China (Mainland)

Brand Name: yujing

Model Number: FU6260

material:: PP and ABS

Supply type:: Make-to-Order

Certification:: ISO:9001

OEM:: Yes

Manufacturer:: Yes

Specification:

 

Packaging & Delivery

 

Packaging Details: Carton or as per your request
Delivery Detail: 7 to 15Days

 

6 laterals Water Distributor for water filter or strainer

 

Item no.

Dimensions(mm)

Diameter of tank (inches/mm)

Top opening

Gap

Rate of flow

A       B        C

FU6260

255  99  50/48.5

12″~16″ (Ø300~Ø400mm)

4”THREAD

0.25mm

10T/H-15T/H
FU6370

365  155  50/48.5

18″~21″ (Ø450~Ø550mm)

4”THREAD

0.25mm

FU6450

450  200  50/48.5

24″ (Ø600mm)

4”THREAD

0.25mm

FU6600

610  280  50/48.5

30″ (Ø750mm)

4”THREAD

0.25mm

FU6700

700  325  50/48.5

36″ (Ø900mm)

4”THREAD

0.25mm

FU6800

850  400  50/48.5

40″ (Ø1000mm)

4”THREAD

0.25mm

FU6900

940  445  50/48.5

48″ (Ø1200mm)

4”THREAD

0.25mm

 

High flow series:

Item no.

Dimensions(mm)

Diameter of tank (inches/mm)

Top opening

Gap

Rate of flow

A       B        C

FU6260B

310  132  50/48.5/63

16″~18″ (Ø400~Ø450mm)

4”THREAD

0.2mm/0.25mm/0.5mm

10T/H-20T/H
FU6370B

430 197  50/48.5/63

21″ (Ø550mm)

4”THREAD

0.2mm/0.25mm/0.5mm

FU6450B

500  227  50/48.5/63

24″ (Ø600mm)

4”THREAD

0.2mm/0.25mm/0.5mm

FU6600B

620  290  50/48.5/63

30″ (Ø750mm)

4”THREAD

0.2mm/0.25mm/0.5mm

FU6700B

750  353 50/48.5/63

36″ (Ø900mm)

4”THREAD

0.2mm/0.25mm/0.5mm

FU6800B

870  416  50/48.5/63

40″ (Ø1000mm)

4”THREAD

0.2mm/0.25mm/0.5mm

FU6900B

90  479  50/48.5/63

48″ (Ø1200mm)

4”THREAD

0.2mm/0.25mm/0.5mm

 


Product detail pictures:

Renewable Design for
 water distributor for water treatments FD5673 for Slovenia Factories detail pictures


For being the stage of realizing dreams of our employees! To build a happier, much more united and much more expert staff! To reach a mutual gain of our prospects, suppliers, the society and ourselves for Renewable Design for water distributor for water treatments FD5673 for Slovenia Factories, The product will supply to all over the world, such as: Germany , Oman , Guinea-Bissau , We warmly welcome your patronage and will serve our clients both at home and abroad with goods of superior quality and excellent service geared to the trend of further development as always. We believe you will benefit from our professionalism soon.


  • Make sure you SUBSCRIBE and LIKE this video to see more like it!!! This is the 6th video of several which will cover Project ZJ from start to finish.

    In this video you will see the 5.2 V8 torn apart to replace several things as preventative maintenance and to cure annoying coolant/oil leaks. The motor was running perfectly with no issues prior to this video. We discovered that the timing cover had a hole in it, most likely from when I lost an idler pulley, and we decided to replace several parts along the way. We also decided to do a new headlight set with new bulbs.

    In this video the oil pan is dropped, the rear main bearing cap is removed because the two piece rear main seal will be replaced with a Fel-Pro. A high volume, 25% over stock, Melling oil pump will be installed. The pan will be resealed with a Fel-Pro one piece gasket. The timing chain had some slack in it so it was replaced along with new timing gears on the crankshaft and camshaft. A new timing cover was installed with a new front seal. The original harmonic balancer was cleaned up and reinstalled along with the original crankshaft pulley. A new water pump was installed with a new bypass hose to the intake manifold. The thermostat housing was replaced along with a new thermostat and Fel-Pro gasket. A new tensioner was installed because the old one was nasty to say the least. The original broken EVAP canister has been removed and replaced with a new relocated canister. A new power steering pump will be installed. New sway bar bushings will be installed.

    The Jeep already has a new aluminum radiator with an electric fan to replace the standard clutch fan. The fan is operated automatically by an adjustable thermostat and also activates when the AC is turned on. The radiator will be reinstalled with brand new upper and lower hoses. New lines are being run for the transmission fluid.

    Check out my other videos if you want more info on the steering box brace which has been a great addition since I’m running 35×12.50 tires. The steering box was recently replaced with a new one. We’ve swapped out the drop pitman arm for one that is about 2″ shorter because it will work better with my lift and IRO OTK steering kit.

    Any parts that were removed but are still functional will be kept for spares on the trails.

    The Iron Rock Offroad long arm kit for the front will be here tomorrow. It includes longer control arms and a heavy duty three piece sub frame assembly to replace the stock transmission crossmember. We will be installing this kit with 2″ spacers on top of my 3.5″ Rubicon Express springs to end up on 5.5″ of lift with adjustable short arms in the rear and long arms in the front. We will also be installing longer stainless steel brake lines and longer shocks. Longer JKS quicker disconnects will replace the current front sway bar disconnects. All four coil springs will receive brand new coil isolators.

    When the project is complete I’ll be going back to the Rubicon trail with my buddy Joel to conquer Cadillac Hill, the one obstacle that we were unable to complete during our first trip.

    Make sure you SUBSCRIBE and LIKE this video to see more like it!!!

    Managers are visionary, they have the idea of "mutual benefits, continuous improvement and innovation", we have a pleasant conversation and Cooperation.







    5 Stars By Ivy 2016-11-28 15:42
    We have been looking for a professional and responsible supplier, and now we find it.

    5 Stars By Johnny 2016-10-09 13:47

    Send your message to us:

    INQUIRY NOW
    • * CAPTCHA: Please select the Plane

    Related Products

    INQUIRY NOW
    • * CAPTCHA: Please select the Key

    WhatsApp Online Chat !