Online Exporter water distributor for water treatments FU6370 to Brasilia Manufacturers

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Being supported by an highly developed and specialist IT group, we could supply technical support on pre-sales & after-sales service for Short Arm Water Cap , Suction Brine Tank , 4 inch reducing Water Distributor , We are wanting forward to even larger cooperation with abroad customers dependant on mutual rewards. Make sure you sense free to make contact with us for more depth!
Online Exporter water distributor for water treatments FU6370 to Brasilia Manufacturers Detail:

Feilite brine valve for water softener

Fob price :us1.5-4/piece

Min.order quantity:10 piece/pieces

Supply Ability: 20000 pieces per month

Port: Ningbo/Shanghai

Payment Terms: L/C,T/T

Place of Origin: Zhejiang, China (Mainland)

Brand Name: yujing

Model Number: FU6260

material:: PP and ABS

Supply type:: Make-to-Order

Certification:: ISO:9001

OEM:: Yes

Manufacturer:: Yes

Specification:

 

Packaging & Delivery

 

Packaging Details: Carton or as per your request
Delivery Detail: 7 to 15Days

 

6 laterals Water Distributor for water filter or strainer

 

Item no.

Dimensions(mm)

Diameter of tank (inches/mm)

Top opening

Gap

Rate of flow

A       B        C

FU6260

255  99  50/48.5

12″~16″ (Ø300~Ø400mm)

4”THREAD

0.25mm

10T/H-15T/H

 

 

 

 

 

 

FU6370

365  155  50/48.5

18″~21″ (Ø450~Ø550mm)

4”THREAD

0.25mm

FU6450

450  200  50/48.5

24″ (Ø600mm)

4”THREAD

0.25mm

FU6600

610  280  50/48.5

30″ (Ø750mm)

4”THREAD

0.25mm

FU6700

700  325  50/48.5

36″ (Ø900mm)

4”THREAD

0.25mm

FU6800

850  400  50/48.5

40″ (Ø1000mm)

4”THREAD

0.25mm

FU6900

940  445  50/48.5

48″ (Ø1200mm)

4”THREAD

0.25mm

 

High flow series:

Item no.

Dimensions(mm)

Diameter of tank (inches/mm)

Top opening

Gap

Rate of flow

A       B        C

FU6260B

310  132  50/48.5/63

16″~18″ (Ø400~Ø450mm)

4”THREAD

0.2mm/0.25mm/0.5mm

 

 

10T/H-20T/H

 

 

 

 

 

 

 

 

 

 

 

FU6370B

430 197  50/48.5/63

21″ (Ø550mm)

4”THREAD

0.2mm/0.25mm/0.5mm

FU6450B

500  227  50/48.5/63

24″ (Ø600mm)

4”THREAD

0.2mm/0.25mm/0.5mm

FU6600B

620  290  50/48.5/63

30″ (Ø750mm)

4”THREAD

0.2mm/0.25mm/0.5mm

FU6700B

750  353 50/48.5/63

36″ (Ø900mm)

4”THREAD

0.2mm/0.25mm/0.5mm

FU6800B

870  416  50/48.5/63

40″ (Ø1000mm)

4”THREAD

0.2mm/0.25mm/0.5mm

FU6900B

90  479  50/48.5/63

48″ (Ø1200mm)

4”THREAD

0.2mm/0.25mm/0.5mm

 


Product detail pictures:

Online Exporter
 water distributor for water treatments FU6370 to Brasilia Manufacturers detail pictures


We insist on offering good quality production with good small business concept, honest income plus the ideal and fast service. it will bring you not only the premium quality solution and huge profit, but by far the most significant should be to occupy the endless market for Online Exporter water distributor for water treatments FU6370 to Brasilia Manufacturers, The product will supply to all over the world, such as: Peru , Guinea-Bissau , Hungary , Our staffs are adhering to the "Integrity-based and Interactive Development" spirit, and the tenet of "First-class Quality with Excellent Service". According to the needs of every customer, we supply customized & personalized services to help customers achieve their goals successfully. Welcome clients from home and abroad to call and inquire!


  • In the nighttime hours preceding the incident, the TMI-2 reactor was running at 97% of full power, while the companion TMI-1 reactor was shut down for refueling.
    The chain of events leading to the partial core meltdown began at 4 am EST on March 28, 1979, in TMI-2′s secondary loop, one of the three main water/steam loops in a pressurized water reactor.

    Workers were cleaning a blockage in one of the eight condensate polishers (sophisticated filters cleaning the secondary loop water), when, for reasons still unknown, the pumps feeding the polishers stopped. When a bypass valve did not open, water stopped flowing to the secondary’s main feedwater pumps, which also shut down. With the steam generators no longer receiving water, they stopped and the reactor performed an emergency shutdown (SCRAM). Within eight seconds, control rods were inserted into the core to halt the nuclear chain reaction but the reactor continued to generate decay heat and, because steam was no longer being used by the turbine, heat was no longer being removed from the reactor’s primary water loop.

    Once the secondary feedwater pumps stopped, three auxiliary pumps activated automatically. However, because the valves had been closed for routine maintenance, the system was unable to pump any water. The closure of these valves was a violation of a key NRC rule, according to which the reactor must be shut down if all auxiliary feed pumps are closed for maintenance. This failure was later singled out by NRC officials as a key one, without which the course of events would have been very different.

    Due to the loss of heat removal from the primary loop and the failure of the auxiliary system to activate, the primary loop pressure began to increase, triggering the pilot-operated relief valve (PORV) at the top of the pressurizer—a pressure active-regulator tank—to open automatically. The relief valve should have closed again when the excess pressure had been released, and electric power to the solenoid of the pilot was automatically cut, but the relief valve stuck open due to a mechanical fault. The open valve permitted coolant water to escape from the primary system, and was the principal mechanical cause of the true coolant-loss meltdown crisis that followed.

    More videos and info below

    ALERT Japan nuke expert Fukushima / Melted fuel rods estimated to be 12 meters underground.

    Japan’s Monju nuclear accident parts 1-3 A Coverup Revealed By Wikileaks Pre Fukushima

    Fukushima catastrophe could be apocalyptic

    Disaster.At.Chernobyl

    Windscale Britains Biggest Nuclear Disaster

    Silent Storm atomic testing in Australia

    Fukushima may be experiencing the early stages of a total China Syndrome.

    Inside the sarcophagus at Chernobyl

    The Ringworm Children testing of large radiation doses on humans

    The True Battle of Chernobyl

    India has started thorium testing in the hopes of cleaner safer energy

    Cleaner Nuclear Power?: Thorium Revolt: Mineral to replace uranium as nuclear power source?

    Nuclear meltdown The Reality Is To Frightening

    Fairewinds Assertions of Fuel Pool Failures at Fukushima confirmed

    Fukushima Now Radiating Everyone – Unspeakable Reality Will Impact All Of Humanity.

    Fukushima Radioactive Rain falls in Toronto,Canada at DANGEROUS levels (20 000 CPM) Aug 14 2011

    Fukushima Fallout found in Australia

    http://www.youtube.com/watch?v=q4jm6nxL_Eg



    http://www.isocool.ltd.uk/
    View the product ranges offered by Process Cooling Specialist, IsoCool. Ranges include process chillers, adiabatic coolers, temperature controllers, mould heaters, and energy-saving heat exchangers.
    Contact IsoCool on 01376 328455 http://www.isocool.ltd.uk/

    Perfect services, quality products and competitive prices, we have work many times, every time is delighted, wish continue to maintain!

    5 Stars By Jessie 2015-10-13 13:50
    As a veteran of this industry, we can say that the company can be a leader in the industry, select them is right.




















    5 Stars By Susan 2016-4-25 19:34

    Send your message to us:

    INQUIRY NOW
    • * CAPTCHA: Please select the Car

    Related Products

    INQUIRY NOW
    • * CAPTCHA: Please select the Truck

    WhatsApp Online Chat !